Sunday 24 Nov

Read more: PIR - Novaol biodiesel plant inauguratedOfficially inaugurated in Porto Corsini, Ravenna the new Novaol biodiesel production plant which has been built on land owned by La Petrolifera Italo Rumena (PIR).

 

The logistic activities for the raw materials and the biodiesel and glycerine produced by the plant are carried out at the nearby PIR terminals to which the production plant is connected.

Read more: PIR - Operational the new terminal PIR 257

We are glad to announce that the new terminal PIR 257 is operational. The terminal consists of 10 tanks for a total storage capacity of 77,200 cbm mostly dedicated to biofuels and vegoils.  For further information please visit the PIR page.

Read more: PIA - Inaugurato il terminal in AlbaniaAlla presenza del Primo Ministro albanese On. Sali Berisha e del Vice Ministro per lo Sviluppo Economico On. Adolfo Urso, di numerose autorità politiche ed esponenti dell’imprenditoria albanesi ed italiani e dei principali operatori europei del settore petrolifero, la La Petrolifera Italo Albanese Sh.A., società del Gruppo PIR, ha inaugurato mercoledì 3 giugno il terminal costiero nella baia di Valona per il transito di GPL, prodotti petroliferi e di altre rinfuse.

Read more: SSTC - PIR Group investments in TunisiaPIR Group has recently acquired an important participation in the oil product terminal of the Societé de Stockage et de Transport de Carburant located in the Southern part of Tunisia, in Zarzis, nearby the well known tourist resort of Djerba.

This terminal is the only service independent terminal presently  existing in Tunisia.

Read more: PIR - New vessels dimensionsIn compliance with Port Ordinance no. 68/2008 issued by the Ravenna Harbour Master, we are pleased to inform you that max dimensions of the vessels allowed for operating at the jetties in the Baiona dock and connected to PIR terminals in Porto Corsini-Ravenna have been increased.

Read more: PIR - First train loaded

We are glad to inform that on October 15 2008, the first train has been loaded at terminal PIR 260 of Porto Corsini.

The train composed by 16 railtankcars has been loaded at the new rail bay .

Real Estate

We use cookies to improve our website and your experience when using it. Cookies used for the essential operation of this site have already been set. To find out more about the cookies we use and how to delete them, see our privacy policy.

  I accept cookies from this site.
EU Cookie Directive Module Information